Six projects show how transformers and packaged substations were specified and delivered for utility networks, renewable generation and industrial facilities.
Saudi Arabia · Riyadh
400 kV Substation Main Transformer Project
Completion 2025
Supplied 12 units
Equipment 220 kV / 400 kV oil-immersed power transformers
Twelve main transformers for a grid upgrade in Riyadh, designed for summer peaks and desert conditions.
The units had to carry full load at ambient temperatures above 50 °C and withstand airborne sand. The design used revised cooling and sealing systems, grain-oriented electrical steel and heat-resistant insulation. Delivery was completed seven months after contract signing.
Kenya · East Africa
50 MW Utility-Scale Solar PV Step-Up Project
Completion 2025
Supplied 20 units
Equipment 35 kV box-type step-up substations
Twenty prefabricated substations connect a 50 MW solar farm to the grid.
The plateau site experiences strong UV exposure and wide temperature swings. Combining the step-up transformer, high-voltage switchgear and monitoring in one IP54 enclosure reduced field installation work. The solar farm produces around 80 GWh per year, according to the original case report.
Vietnam · Ho Chi Minh City
Industrial Park Distribution Project
Completion 2024
Supplied 35 units
Equipment 10 kV / 0.4 kV box-type substations and distribution transformers
A power distribution package for a 200-hectare manufacturing park with more than 80 tenants across electronics, textiles and light industry.
The 35 units were configured in a ring main so individual units could be serviced while other loads remained supplied. The equipment was rated for tropical service and certified by the local power authority. Engineers spent three months supporting installation, commissioning and operator training on site.
UAE · Dubai
AI Data Centre Power Distribution Project
Completion 2026
Supplied 48 units
Equipment 10 kV dry-type transformers and intelligent switchgear
Cast-resin dry-type transformers and distribution equipment for an AI data centre with rack densities above 20 kW.
Power continuity and quality were central to this indoor installation. The equipment features windings encapsulated in flame-retardant epoxy resin, temperature controls and an RS485 interface for building management monitoring. The original case reports no-load and load losses below EU MEPS thresholds and follow-on orders after commissioning.
Guinea · West Africa
Hydropower Station Main Transformer Project
Completion 2024
Supplied 4 units
Equipment 110 kV / 220 kV power transformers
Four main transformers for a 120 MW hydropower plant supplying the capital and surrounding region.
Restricted road access required shipment in separate sections for assembly at the plant. Reinforced insulation and vacuum oil filling addressed the site's tropical heat and humidity. Senior engineers assisted with installation, commissioning and training for local technicians.
Oman · Muscat
Urban Distribution Network Upgrade Project
Completion 2025
Supplied 60 units
Equipment 11 kV intelligent box-type substations
Sixty substations for Muscat's distribution upgrade, with remote monitoring and automatic fault isolation.
The project replaced equipment that had been in service for more than 25 years. Remote terminal units and fault indicators helped lower average outage repair time from four hours to under 30 minutes, as reported in the original case. Low operating noise suited residential sites, and all three scheduled delivery batches arrived on time.